Our Projects

Meridian Creek Middle School in West Linn, OR completed July 2017. Project ran by general Robinson Construction

Beatrice Morrow Cannady Elementary
Happy Valley, OR

Metal Framing, Gypsum Board, Acoustical Ceilings, Wood Ceilings, Wood Wall Systems

General: Robinson Construction Co
The Club at The Park, Apartments
Drywall Installation, Drywall Finishing, Acoustical Ceiling Systems
Vancouver, WA

General: Sierra Construction Company
Isabella Court Apartments
Vancouver, WA

Exterior Paint, Steel Framing, Drywall Install, Drywall Taping, Acoustical Ceilings.

General:
TEAM Construction
Camas High School
Metal Stud Framing, Drywall, Acoustical Gypsum Ceilings, Acoustical Ceiling Systems, Wood Ceiling Systems, Install door frames.
General: Robinson Construction
Block 8
Vancouver Waterfront, WA
Exterior & Interior Framing, DensGlass

General: Robertson & Olson
Precision Castparts Corp
Portland, OR
Exterior and Interior Paint Project

General: JH Kelly
Port of Camas Washougal
Metal Stud Framing, Drywall Installation, Drywall Taping, Interior Painting

General: Rotschy Inc
Block 12
Vancouver Waterfront

Steel Framing, Drywall Install, Drywall Taping, Rigid X Ceiling.

General: Robertson & Olson
Laurel 42
Metal Stud Framing, Drywall, PVA & Primer, Acoustical Ceiling Systems.
General: Deacon Construction
Show More

M&C Construction LLC 5900 NE 152nd Ave Suite 170, Vancouver, WA 98682

Contact us: office@mandcconstructionllc.com | Call now: (360) 702-6233

  • Black LinkedIn Icon
  • Black Facebook Icon
  • Black Instagram Icon

© 2018 by M&C Construction LLC

Camas High School

Metal Stud Framing, Drywall, Acoustical Gypsum Ceilings, Acoustical Ceiling Systems, Wood Ceiling Systems, Install door frames. General: Robinson Construction

Go to link